ARROW FALCON EXPORTERS INC OH-58C near Brentwood, CA — 2011-07-03
- Date
- 2011-07-03
- Location
- Brentwood, CA, USA
- Aircraft
- ARROW FALCON EXPORTERS INC OH-58C
- Registration
- N6264D
- Category
- Helicopter
- Highest injury
- Serious
- Fatalities
- 0
- Phase of flight
- Maneuvering
Probable cause
The failure of the main rotor mast due to fatigue cracking originating from corrosion pits.
NTSB narrative
During an aerial application flight, the helicopter's main rotor mast separated, and the helicopter fell from a height of about 30 feet and impacted terrain. Postaccident examination of the wreckage found that the mast had fractured below the point where it extended from the transmission and just above the mast seal retainer plate. Examination of the fracture surfaces revealed that an area of fatigue extended about 95 degrees around the mast’s circumference. The remaining portions of the fracture were identified as low cycle fatigue and overload. The fracture had multiple origins at corrosion pitting on the threads of the mast. The source of the corrosion could not be determined. Maintenance records indicated that the most recent overhaul of the main rotor mast assembly was completed 1,486 hours before the accident. At that time, a magnaflux inspection was performed on the main rotor mast with no discrepancies noted. The records indicate that, during reassembly, a sealant was applied to the threads for corrosion protection. When the mast is installed on the helicopter, the location where the corrosion and fracture occurred is hidden. To fully inspect the area, the mast assembly must be removed from the helicopter and completely disassembled. A second mast failure on a helicopter of the same make and model series occurred on January 20, 2012, in Brawley, California (WPR12LA096). In February 2012, the helicopter manufacturer issued an alert service bulletin that reduced the main rotor mast overhaul interval from 2,400 hours to 1,200 hours. In July 2012, the Federal Aviation Administration issued Airworthiness Directive (AD) 2012-14-11, applicable to Arrow Falcon Exporters, Rotorcraft Development Corporation, and San Joaquin Helicopters model OH-58A, OH-58A+, and OH-58C helicopters. The AD required, within 30 days, overhaul of the main rotor mast assemblies of these helicopters.
Analysis
- Primary failure mode
- Mechanical failure
- First missed decision gate
- Inspection of the main rotor mast assembly should have been more frequent.
NTSB coding
Evidence available
- Photos
- 11 docket documents
Docket documents11
- Pilot/Operator Aircraft Accident Report, NTSB Form 6120.1form
- Release of Aircraft Wreckage, NTSB Form 6120.15form
- Pilot Statementinterview
- Statement of Party Representatives to NTSB Investigationinterview
- Arrow Falcon ASB Main Rotor Mast Revision 1other
- Drawings OH-58 Mastother
- FAA New AD Sheetother
- Maintenance Logbook Excerptsother
- Record of Conversation - V Symondsother
- Photo 1. Lower main shaft shearphotos
- Photo 2. Upper main shaft shearphotos
Related mishaps
- HUGHES 369
2024-09-11 · Canton, MI
- MCDONNELL DOUGLAS HELICOPTER 600N
2024-07-16 · Eagle Lake, TX
- BELL 206L-3
2024-04-23 · Tracy, CA
- ROBINSON HELICOPTER COMPANY R44 II
2022-07-22 · Waterloo, IL
- BELL 206B
2022-06-24 · Merced, CA
- PYKA INC PELICAN
2022-05-14 · Winters, CA